Snagging: the week that decides your first two years

You get one window to hand a defect list back to the developer. Most owners spend it on furniture instead.

⚠️ Draft article — written to lay the page out, not checked against a current price list. Replace before launch.

Handover comes with a defects liability period, and it starts the day you take the keys — not the day you notice something. Every week you spend measuring for a sofa is a week off the clock.

Book the inspection before the keys

An independent snagging inspection takes a day and produces a photographed list a developer's contractor cannot argue with. Book it for the handover week, not after you have moved in — once your furniture is in the room, every argument about a floor level becomes a conversation about who scratched what.

What is worth arguing about

Paint and silicone will be on every list and will be fixed without a fight. The items worth your attention are the ones that get expensive later: falls on balcony drainage, AC condensate routing, water pressure on the top floors, door alignment, and the electrical load on the kitchen circuit. Those are the defects that turn into a maintenance bill in year two.

Hand the list in writing, keep the acknowledgement, and re-inspect before you sign anything confirming the work is complete. We attend that re-inspection with our clients as a matter of course, and it is the least glamorous hour of the entire purchase.

Want this run on your own numbers?

Tell us the budget, the area and the timeline. We will tell you honestly whether it works — and what to do if it does not.

Start the conversation

One of our advisers replies within a working day.

Or call +971 54 583 2330